{"id":705,"date":"2026-11-12T17:10:20","date_gmt":"2026-11-12T09:10:20","guid":{"rendered":"http:\/\/www.elitesfemmes.com\/blog\/?p=705"},"modified":"2026-11-12T17:10:20","modified_gmt":"2026-11-12T09:10:20","slug":"what-is-a-current-transformer-burden-calculation-example-434f-c8ad13","status":"publish","type":"post","link":"http:\/\/www.elitesfemmes.com\/blog\/2026\/11\/12\/what-is-a-current-transformer-burden-calculation-example-434f-c8ad13\/","title":{"rendered":"What is a current transformer burden calculation example?"},"content":{"rendered":"<p>If you\u2019ve ever worked with current transformers (CTs) in power systems\u2014whether you\u2019re an electrical engineer, a system integrator, or a plant maintenance manager\u2014you\u2019ve probably heard the term \u201cburden\u201d thrown around more than once. Early in my career as a supplier of current and potential transformers, I used to gloss over that part of CT specification sheets, assuming it was just another technical detail only for deep-p diving engineers to worry about. That changed when I got a frantic call from a manufacturing plant where our CTs were being used, and their revenue-grade energy meter was showing readings that were off by nearly 8%. Turns out, they\u2019d installed the CTs without accounting for the actual burden on the secondary side, not just the meter\u2019s listed burden. <a href=\"https:\/\/www.suvell.com\/current-and-potential-transformer\/\">Current and Potential Transformer<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.suvell.com\/uploads\/42741\/small\/12kv-indoor-vacuum-interrupterb8b73.jpg\"><\/p>\n<p>That incident taught me that burden calculation isn\u2019t just a theoretical exercise\u2014it\u2019s the difference between accurate billing, safe operation, and costly downtime. Today, as someone who\u2019s spent 15 years selling and supporting CTs, I\u2019ve seen firsthand how a single miscalculation can derail a project, or how a correct calculation can ensure a CT works reliably for decades. Let\u2019s walk through a real-world example, the kind I share with every customer when they\u2019re ordering CTs for their next installation, so you can see exactly how this works.<\/p>\n<p>First, let\u2019s get the basics straight for anyone who\u2019s new to CTs. A current transformer steps down the high primary current in a power line to a low, standardized secondary current\u2014almost always 5A or 1A for most industrial and commercial applications. The secondary side of the CT is connected to devices that measure that current: energy meters, protection relays, power quality analyzers, or even multiple devices strung together. All of these devices have their own internal resistance, and the total resistance from the CT\u2019s secondary terminals, through all connected devices, back to the CT is called the <em>burden<\/em>. It\u2019s measured in ohms, or sometimes in volt-amperes (VA), which is just ohms multiplied by the square of the secondary current (since VA = I\u00b2R, and for 5A CTs, that\u2019s 25 times the resistance value).<\/p>\n<p>The critical rule here is that a CT is designed to handle a maximum burden without its accuracy slipping. Every CT has a rated burden listed on its nameplate\u2014for example, a common 500:5A CT might have a rated burden of 15 VA or 3 ohms. If the actual burden from your connected devices is higher than that rated burden, the CT won\u2019t convert primary current to secondary current accurately. For revenue meters, that means you could be overpaying for electricity you didn\u2019t use; for protection relays, it could mean they don\u2019t trip fast enough during a fault, leading to equipment damage or safety hazards.<\/p>\n<p>Now, let\u2019s dive into that real example I mentioned earlier. A mid-sized food processing plant reached out to me last year, needing CTs for their new 480V main distribution panel. They wanted to use three CTs for two purposes: 1) a revenue-grade energy meter to track their electricity use for billing, and 2) a digital overcurrent protection relay to shut down the panel if there was an overload or short circuit. They also planned to add a power quality analyzer later, though that wasn\u2019t in the initial installation.<\/p>\n<p>First, let\u2019s outline the components they were connecting, because that\u2019s where the burden adds up. For each phase (there are three phases, so three CTs), they had:<\/p>\n<ol>\n<li>A revenue meter: This is a Siemens 5-series energy meter, which has a listed burden of 0.3 VA per current input.<\/li>\n<li>A protection relay: A Schweitzer Engineering SEL-751 relay, used for overcurrent and earth fault protection, with a current input burden of 0.5 VA per phase.<\/li>\n<li>A power quality analyzer: They planned to add this later, and the manufacturer listed its burden as 0.2 VA per current input.<\/li>\n<li>Connecting wiring: This is often overlooked, but it\u2019s a huge part of the burden. The CTs were mounted in the main breaker panel, located 75 feet away from the metering and relay cabinet, which was in a separate control room. The wire they planned to use was standard 14 AWG copper, which has a resistance of 2.525 ohms per 1,000 feet.<\/li>\n<\/ol>\n<p>Now, let\u2019s pick a CT secondary current rating for this application. The main panel\u2019s maximum demand was 450A, so the plant wanted a CT with a primary rating of 500:5A\u2014this is standard for 480V panels, as it balances accuracy and compatibility with common meters and relays.<\/p>\n<p>Next, we need to calculate the total actual burden, step by step. Remember, for 5A CTs, VA burden is I\u00b2R, so R = VA \/ I\u00b2. We\u2019ll also need to account for the wiring resistance, because that\u2019s part of the circuit from the CT\u2019s secondary terminals to each connected device.<\/p>\n<p>First, calculate the wiring resistance per phase. The distance between the CT and the devices is 75 feet, but current flows <em>both ways<\/em> in a secondary circuit, so we have to double the length of the wire. That\u2019s 75 feet x 2 = 150 feet of wire per phase. 14 AWG copper is 2.525 ohms per 1,000 feet, so 150 feet x (2.525 \/ 1,000) = 0.37875 ohms per phase. Let\u2019s round that to 0.38 ohms for simplicity.<\/p>\n<p>Now, calculate the burden from each device, in ohms, and add them up. Wait\u2014important note: if devices are connected in parallel, their burdens add inversely, but in this case, each phase\u2019s CT secondary is wired to one meter, one relay, and one analyzer <em>in series<\/em> on that phase\u2019s circuit. So their ohmic burdens add directly. Let\u2019s confirm that:<\/p>\n<ul>\n<li>Revenue meter burden: Listed as 0.3 VA. For 5A, that\u2019s R = VA \/ I\u00b2 = 0.3 \/ (5\u00b2) = 0.3 \/ 25 = 0.012 ohms.<\/li>\n<li>Protection relay burden: 0.5 VA. R = 0.5 \/ 25 = 0.02 ohms.<\/li>\n<li>Power quality analyzer burden: 0.2 VA. R = 0.2 \/ 25 = 0.008 ohms.<\/li>\n<\/ul>\n<p>Now add those device burdens, plus the wiring burden:<br \/>\nTotal actual burden (ohms) = 0.012 + 0.02 + 0.008 + 0.38 = 0.42 ohms.<\/p>\n<p>Now let\u2019s convert that total burden to VA to match the CT\u2019s nameplate rating. VA = I\u00b2R = 5\u00b2 x 0.42 = 25 x 0.42 = 10.5 VA.<\/p>\n<p>Here\u2019s where the plant almost went wrong. When they first reached out, they told me they\u2019d looked at a 500:5A CT with a 10 VA rated burden. Wait\u2014our calculation gave an actual burden of 10.5 VA, which is <em>higher<\/em> than the CT\u2019s 10 VA rated burden. That\u2019s the mistake the plant\u2019s maintenance team almost made: they only looked at the meter\u2019s and relay\u2019s burdens, not the wiring, and they picked a CT with a rated burden that was too low.<\/p>\n<p>Why does that matter? A CT\u2019s rated burden is the maximum burden it can handle and still meet its accuracy class. Most revenue meters require 0.5% or better accuracy, and if the CT is overburdened, its error can jump to 2% or more. That would mean the plant was being charged for 8% more electricity than they actually used\u2014on a 10,000 kWh monthly bill, that\u2019s an extra $1,200 a month, which adds up to $14,400 a year. For small to medium manufacturers, that\u2019s a lot of money.<\/p>\n<p>So what was the solution here? I worked with the plant\u2019s engineer to adjust the CT selection. The next standard CT rating for 500:5A is 15 VA, which has a rated burden of 15 VA \/ 25 = 0.6 ohms. That\u2019s more than enough to cover their 10.5 VA actual burden, even leaving a small safety margin (never size exactly\u2014always add a 20% buffer, which would put the minimum required burden at ~12.6 VA, so 15 VA is perfect). We also confirmed that adding the power quality analyzer later wouldn\u2019t be a problem, because its 0.2 VA is already included in our total, and the 15 VA CT could handle that without any issues.<\/p>\n<p>Wait, but let\u2019s make sure we didn\u2019t skip any steps that matter for other applications. What if this was a low-voltage residential application, not an industrial plant? The same logic applies\u2014just with lower currents. For a 100A residential CT with a 1A secondary rating, you\u2019d calculate burden the same way, just using 1A instead of 5A for the VA to ohms conversion. Another common case: if you have multiple devices on a single CT, like two meters and a relay, you have to add all their burdens (plus wiring) correctly. I always tell customers to list every single device connected to the CT, even something as small as a terminal block\u2014terminal blocks add a tiny bit of burden, usually ~0.05 ohms per connection, and if you have two or three, that adds up fast.<\/p>\n<p>I\u2019ve had other customers make similar mistakes. One solar installation company tried to use a 200:5A CT rated for 5 VA for a 100-foot run to a grid-tie inverter. They forgot that the 100-foot wire (doubled to 200 feet, so 200 x 2.525 \/ 1000 = 0.505 ohms) plus the inverter\u2019s 0.4 VA burden gave a total burden of (0.4 \/25) + 0.505 = 0.016 + 0.505 = 0.521 ohms, or ~13 VA. Their original 5 VA CT was way too small, leading to inaccurate export readings, which almost caused them to get penalized by the utility for underreporting their solar output. That\u2019s why I always emphasize: never skip the wiring burden, even if it seems trivial.<\/p>\n<p>Another thing to note: some CTs list burden in ohms, not VA, so you can use either unit as long as you\u2019re consistent. If a CT has a rated burden of 0.6 ohms, that means the maximum resistance it can handle is 0.6 ohms, regardless of the secondary current (though again, for 5A systems, VA is just 25 times the ohm value, so 0.6 ohms = 15 VA, which matches the CT we used for the food plant).<\/p>\n<p>Now, let\u2019s talk about safety, because burden calculation isn\u2019t just about accuracy. If a CT is heavily overburdened, its secondary voltage can rise significantly, which is a shock hazard to anyone working on the panel. The SEL-751 relay I mentioned earlier has a maximum continuous voltage rating of 600V, but an overburdened CT can push that to hundreds of volts if there\u2019s a fault. That\u2019s why staying within the CT\u2019s rated burden isn\u2019t just a technical detail\u2014it\u2019s a safety requirement.<\/p>\n<p>So what should you do when you\u2019re doing a CT burden calculation? Let\u2019s recap the steps, so you can follow them for your next project:<\/p>\n<ol>\n<li>Confirm your CT\u2019s secondary current rating (standard is 5A for most industrial\/commercial, 1A for some specialty applications).<\/li>\n<li>List <em>every<\/em> device connected to the CT\u2019s secondary: meters, relays, analyzers, terminal blocks, anything that has a current input. Get their burden values, usually listed in VA on the datasheet.<\/li>\n<li>Measure the length of the secondary wiring between the CT and the farthest connected device. Remember to double that length for the two-way circuit.<\/li>\n<li>Calculate the wiring burden: get the resistance of your wire (14 AWG is ~2.525 ohms per 1000ft, 12 AWG is ~1.588 ohms per 1000ft, etc.), multiply by the total wire length (in thousands of feet, or convert to miles\/meters as needed) to get ohms, then convert to VA if you want (VA = I\u00b2R).<\/li>\n<li>Add all device burdens (plus wiring, plus any extra burden from splices or connections) to get total actual burden.<\/li>\n<li>Compare that to the CT\u2019s rated burden, adding a 20-30% safety margin to avoid errors. If your total actual burden is higher than the CT\u2019s rated burden, you need a CT with a higher rated burden, or a larger wire (which reduces wiring burden) to bring the total down.<\/li>\n<\/ol>\n<p>I always tell customers that if you\u2019re unsure about the wiring burden, or if you have multiple CTs with different burdens, reach out to the supplier before ordering. We\u2019ve seen way too many projects where someone ordered the wrong CT because they skipped the calculation, and had to scramble to swap CTs at the last minute, delaying installation and costing money. As a current and potential transformer supplier, my job isn\u2019t just to ship parts\u2014it\u2019s to make sure those parts work correctly for your application, so you don\u2019t have to deal with the headaches of inaccurate readings or safety issues.<\/p>\n<p>Back to the food plant example: after we adjusted the CT to a 15 VA 500:5A unit, we went back to check their accuracy. The plant\u2019s energy meter is now reading within 0.2% of their utility\u2019s meter, which means no more overpaying, and the protection relay trips at exactly the current it\u2019s set for, so their equipment is protected. They even added the power quality analyzer a few months later, and there was no issue because the total burden was still well under the CT\u2019s rating.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.suvell.com\/uploads\/42741\/small\/byfi-40-5-630-25-three-phase-two-position1e67f.png\"><\/p>\n<p>If you\u2019re working on a new installation, upgrading existing CTs, or just troubleshooting inaccurate readings, burden calculation is the foundation of reliable CT performance. It\u2019s not as complicated as it sounds once you break it down, and taking the time to do it right saves you from costly mistakes down the line. If you need help sizing CTs, calculating burden, or have questions about which CT is right for your project, we\u2019re here to walk through it with you\u2014no confusing jargon, just practical advice based on years of working with power system engineers and plant managers like you.<\/p>\n<p><a href=\"https:\/\/www.suvell.com\/electrical-power-fitting\/\">Electrical Power Fitting<\/a> References<\/p>\n<ol>\n<li>Cooper, W. D., &amp; Nelson, D. E. (2000). <em>Electrical Safety Engineering<\/em>. John Wiley &amp; Sons.<\/li>\n<li>Schweitzer Engineering Laboratories. (2022). <em>SEL-751 Feeder Protection Relay Datasheet<\/em>. Pullman, WA: SEL Inc.<\/li>\n<li>Siemens AG. (2021). <em>SENTRON 5 Series Energy Meter Technical Specification<\/em>. Munich, Germany: Siemens.<\/li>\n<li>Underwriters Laboratories. (2019). <em>UL Standard for Current Transformers, UL 1244<\/em>. Northbrook, IL: UL LLC.<\/li>\n<\/ol>\n<hr>\n<p><a href=\"https:\/\/www.suvell.com\/\">Wenzhou Shuowei Electric Co., Ltd.<\/a><br \/>Wenzhou Shuowei Electric Co., Ltd. is one of the most professional current and potential transformer manufacturers and suppliers in China, specialized in providing high quality customized service. We warmly welcome you to wholesale bulk current and potential transformer in stock here from our factory. Contact us for quotation.<br \/>Address: No.208 Wei 12 Rd, Yueqing Economic Development Zone, Wenzhou, China<br \/>E-mail: admin@suvell.com<br \/>WebSite: <a href=\"https:\/\/www.suvell.com\/\">https:\/\/www.suvell.com\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you\u2019ve ever worked with current transformers (CTs) in power systems\u2014whether you\u2019re an electrical engineer, a &hellip; <a title=\"What is a current transformer burden calculation example?\" class=\"hm-read-more\" href=\"http:\/\/www.elitesfemmes.com\/blog\/2026\/11\/12\/what-is-a-current-transformer-burden-calculation-example-434f-c8ad13\/\"><span class=\"screen-reader-text\">What is a current transformer burden calculation example?<\/span>Read more<\/a><\/p>\n","protected":false},"author":368,"featured_media":705,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[668],"class_list":["post-705","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-current-and-potential-transformer-44c3-c96264"],"_links":{"self":[{"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/posts\/705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/users\/368"}],"replies":[{"embeddable":true,"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/comments?post=705"}],"version-history":[{"count":0,"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/posts\/705\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/posts\/705"}],"wp:attachment":[{"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/media?parent=705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/categories?post=705"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.elitesfemmes.com\/blog\/wp-json\/wp\/v2\/tags?post=705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}